Fibre Reinforced Facade Encyclopedia: Design and detailing
Civil infrastructure facades are the cladding, lining and permanent formwork elements applied to tunnels, portals, bridges, stations, noise walls and other transport structures, where the governing requirements are durability over a very long design life and the near impossibility of getting access to maintain them. They differ from building facades in almost every design driver. The design life is longer, the loads include traffic and aerodynamic effects rather than wind alone, the client is an asset owner with a whole-of-life cost model, and any future maintenance has to fit inside a night possession or a lane closure.
A building facade is typically designed for 25 to 50 years with maintenance access from a swing stage. A road tunnel lining is designed for 100 years, and the only access to it is during scheduled closures measured in hours.
At a glance
| Property | Typical value | Note |
|---|---|---|
| Design life | 50 to 100 years | Against 25 to 50 years for a building facade |
| Governing requirement | Durability and maintainability | Rather than appearance or first cost |
| Common elements | Stay-in-place formwork, tunnel linings and portals, bridge parapets, noise walls, station canopies | Glass fibre reinforced concrete and FRP both used |
| Loads beyond wind | Vehicle impact, aerodynamic pressure pulses, vibration | Rail and road tunnels see repeated pressure cycling |
| Aerodynamic pressure in rail tunnels | Repeated positive and negative pulses from passing trains | Fixings are a fatigue case, not a static case |
| Cleaning regime | Periodic washdown with detergents or mild alkaline cleaners | Finish must tolerate the specified cleaning agent |
| Anti-graffiti | Commonly required to reachable height | Sacrificial or permanent coating, specified with the finish |
| Access windows | Night possessions and lane closures | Panel size and fixing type chosen around them |
| Weight | ShapeShell-RT 5 to 32 kg/m2; ShapeShell-RC 30 to 50 kg/m2 | Published ranges; light panels suit short possessions |
Stay-in-place formwork
The oldest and still one of the most useful roles for glass fibre reinforced concrete in civil work is as permanent formwork. A thin GRC shell is made to the finished profile, placed on site, filled with structural concrete and left in place as the permanent face of the element. It replaces stripping and reuse of conventional formwork with a single operation, it gives an architectural profile to an element that would otherwise be plain, and because the shell is cementitious it is compatible with the concrete it contains.
It suits bridge parapets and edge beams, tunnel portal returns, retaining wall facings, culvert headwalls and any curved or profiled element where building and stripping conventional formwork in a live corridor would be slow and hazardous. The design issues are the pressure of the wet concrete pour on a thin shell, which sets the pour rate and the temporary propping, and the connection between the shell and the core concrete, which is usually achieved with cast-in ties or a mechanical key rather than by relying on bond alone.
Tunnels, portals and linings
Tunnel environments punish materials. Linings are exposed to continuous humidity, to vehicle exhaust residues or to iron dust in rail tunnels, to repeated washing with detergents, and in rail to a repeated aerodynamic pressure pulse each time a train passes. That pulse is the design case most often underestimated: it is a cyclic load applied tens of thousands of times a year, so panel fixings are checked for fatigue and for loosening, not just for peak capacity.
Portals are a different problem again, being the architectural face of the asset and often a landmark element. They are where the moulded capability of GRC and FRP is most useful, because a portal is typically a curved, tapering form that would be difficult and expensive to cast in situ. Fire in tunnels is a specialist subject governed by the relevant road or rail authority’s requirements and by project specific fire engineering; the applicable test regime and design fire must be taken from those documents rather than assumed from building provisions.
Bridges, parapets and roadside elements
Anything within the road corridor has to account for vehicle impact, and the rule is that a cladding or facing element must not create a hazard when struck. That usually means the cladding is either behind a compliant barrier, or is sacrificial and detailed so that it breaks up without producing dangerous debris or projecting fixings. Barrier performance itself is a matter for the road authority’s standards and the structural design of the barrier, not for the cladding.
Noise walls add their own set of drivers, principally acoustic performance, wind load on a tall free-standing element, and the fact that both faces are visible. Elsewhere in the corridor, durability considerations follow the exposure classification: chloride from marine air or from de-icing where it is used, carbonation over a long life, and abrasion from windblown grit. GRC has no steel in the skin, so the cover requirements that dominate conventional concrete durability do not apply to it, which is a substantial advantage in an aggressive exposure.
Designing for access, not just for loads
The question an asset owner asks first is what happens in year 30. Access to a tunnel lining or a bridge soffit is expensive and disruptive, so a design that requires regular attention is rejected regardless of its first cost. That pushes design toward finishes that do not require recoating, fixings that can be inspected and replaced from the accessible side, panels small enough to be handled during a short possession, and a documented replacement procedure for a single damaged panel.
- Specify panel sizes that can be removed and replaced within a typical possession window
- Use demountable fixings accessible from the front face wherever a panel may need to be removed for services access
- Retain the fabrication model so a matching replacement can be produced years later; the model outlives the moulds
- Nominate the cleaning agents and pressures the finish must tolerate, and test the finish against them
- Specify anti-graffiti treatment to reachable height and record the recoating procedure
- Provide a maintenance manual with inspection intervals and a spares schedule
Standards and references
- AS 5100 series, bridge design, including AS 5100.1 scope and general principles and AS 5100.2 design loads
- AS 3600 concrete structures, and AS 5216 design of fastenings in concrete
- AS/NZS 1170.2 wind actions, for free-standing noise walls and exposed elements
- GRCA Specification for the Manufacture, Curing and Testing of GRC Products, and BS EN 1169 and EN 1170 for production control and testing
- AS 1530.1 combustibility and AS 5637.1 group number, where the element forms part of a building external wall (check the edition of the NCC adopted in your jurisdiction)
- Relevant state road and rail authority technical specifications for tunnel linings, noise walls and durability requirements
Related terms
Questions specifiers ask
What is stay-in-place formwork?
A thin GRC shell made to the finished profile, placed on site and filled with structural concrete, then left as the permanent face of the element. It removes the stripping operation and gives a profiled or curved face to elements such as bridge parapets and portal returns.
Why is design life the dominant issue in infrastructure cladding?
Because the asset is designed for 50 to 100 years and access for maintenance is expensive and disruptive. A system that needs recoating or regular attention is rejected on whole-of-life cost even if it is cheaper to install.
What loads apply that do not apply to a building facade?
Vehicle impact within the road corridor, and in tunnels a repeated aerodynamic pressure pulse from passing vehicles or trains that acts as a fatigue load on fixings. Vibration and abrasion from windblown grit also feature.
Why is GRC used in aggressive exposures?
Because there is no steel in the skin, so the cover requirements that govern the durability of conventional reinforced concrete do not apply. Alkali resistant glass fibre in a controlled mix does not corrode, which suits marine and chloride exposures.
How is a single damaged panel replaced years later?
By retaining the fabrication model, specifying demountable front-accessible fixings, and keeping a spares schedule. The model outlives the moulds and is what allows a matching replacement to be produced.