Fibre Reinforced Facade Encyclopedia: Finishes

Colour consistency is the degree to which panels across a facade match one another in colour and tone. It is a managed range, not an absolute. A cementitious panel takes its colour from cement, sand, pigment, water content, curing conditions and the surface finish applied afterwards, and every one of those varies between batches, so the honest objective is a narrow, agreed, controlled range rather than uniformity. Specifications demanding a perfect match are not met by any manufacturer of any cementitious product, and pretending otherwise moves the argument to the end of the job.

Two panels from the same mould, the same mix design and the same week can differ visibly if one was cast on a cool morning and demoulded at 18 hours and the other on a hot afternoon and demoulded at 14. Nothing was done wrong.

At a glance

PropertyTypical valueNote
Nature of the propertyA managed range, not a single valueAcceptance is against a sample range
Largest single variableCement colourGrey cement varies far more than white
Second variableSand colour and gradationA large volume fraction of the mix
Third variableWater content and curing temperatureAffects paste density and surface tone
Pigment controlBatch by weight, single reserved batchNot by bag count or scoop
Control sample sizeAt least 600 by 600 mmMade by the production method and mix
Acceptance rangeTypically 2 or 3 samples showing the extremesSigned, matched copies at plant and site
Viewing conditionsVertical, outdoors, diffuse daylightAt an agreed distance, commonly 5 to 10 metres
MeasurementColorimeter, CIE L*a*b*, delta EA trend record; the eye decides acceptance

Where the variation comes from

Cement is dominant. Grey Portland cement is a strongly coloured material whose tone shifts with clinker source, iron content and the proportion of supplementary cementitious materials, and it is present at many times the dose of any pigment, so a change of cement source part way through a facade will be visible no matter what else is controlled. White cement varies much less, which is one reason it is specified where colour control matters.

Sand is second: in a glass fibre reinforced concrete mix the fine silica sand is a large volume fraction and its own colour shows through the paste, and quarry faces, washing and screening all change over time. Water content and curing conditions come third, since more water gives a paler, more open paste and a hot fast cure gives a different surface tone from a cool slow one, which is why panels cast on the same day match each other better than panels cast weeks apart.

Pigment dose is fourth, and it is the variable most people assume is first. Dosed by weight from a single reserved batch it is one of the better controlled inputs; dosed by bag or by eye it becomes the worst. The surface finish sits across all of it, since acid etching and sandblasting remove the laitance layer where much surface irregularity lives, while an off-form face shows everything.

The controls that work

  • Single cement source and type, reserved for the project and confirmed in writing, with delivery dockets retained
  • Single sand source and gradation, and where practical a single reserved covered stockpile
  • Single pigment manufacturing batch, reserved at the outset, batched by weight with recorded results
  • Fixed mix design with a tight water tolerance, batched by weight rather than by volume
  • Consistent demoulding age and curing regime, recorded per panel, with allowance for ambient temperature
  • Batch sequencing: cast the panels for a single elevation or visual zone in one continuous sequence
  • Mould rotation control, since mould face condition and age affect the cast surface
  • Panel mapping: every panel numbered at the plant, recorded against its batch, and placed to a plan
  • A signed control sample range with matched copies at plant and site, and a first-off full-size panel

Panel mapping deserves attention because it is the one control that works after the fact. If panels are numbered and their batch recorded, the installer can be given a placement plan that distributes drift so adjacent panels are always from adjacent batches, and any genuine outlier can be placed on a secondary elevation or rejected before it is lifted. Panels delivered unnumbered and installed as they come off the truck will show every gradation in the run as a random patchwork, which is the worst possible outcome from the same set of panels.

Setting the acceptance standard

The mechanism that works is a range, not a target. Make two or three control samples from the production mix, by the production method, carrying the specified finish, representing the acceptable light and dark extremes. Have the architect sign them, keep matched sets at plant and site, and accept production that falls within the range. There is then no argument about whether a panel matches the ideal, because there is no ideal.

Viewing conditions must be written down or the assessment is meaningless: vertical, outdoors, in diffuse daylight rather than direct sun, with adjacent panels in their installed relationship, at an agreed viewing distance, usually between five and ten metres. A facade is not read at arm’s length and a standard applied at arm’s length cannot be met.

What to expect, and what to tell the client

For projects delivered in stages, or extended later, reserve materials and control samples for the later stage at the beginning of the first and record the mix, sources and batch data. Matching a facade five years later from fresh cement and sand is the hardest colour problem in the industry, and it is usually solved by a deliberate change of tone at a joint rather than an attempted match.

Standards and references

  • GRCA Specification for the Manufacture, Curing and Testing of GRC Products, including sampling and acceptance
  • PCI MNL-117 Manual for Quality Control for Plant Produced Architectural Precast Concrete, colour and finish acceptance
  • AS 3972 General purpose and blended cements, and AS 2758.1 aggregates, for source consistency
  • ASTM C979 Standard Specification for Pigments for Integrally Colored Concrete
  • AS 3610.1 Formwork for concrete, surface finish classes
  • CIE L*a*b* colour space and delta E, for production trend monitoring rather than acceptance

Related terms

Questions specifiers ask

Can GRC panels be made to match exactly?

No, and no cementitious product can. Cement, sand, water content, curing temperature and the surface finish all vary, so the achievable outcome is a narrow, agreed, controlled range. Acceptance should be against a signed range of control samples showing the acceptable extremes, not a single ideal piece.

What causes most of the variation?

Cement, by a wide margin, because it is a strongly coloured material present at many times the dose of any pigment and grey cement varies with source and clinker. Sand is second, water content and curing third, and pigment dose fourth if it is batched by weight from a single reserved batch.

What is panel mapping and why does it matter?

Every panel is numbered at the plant and recorded against its batch, and the installer places panels to a plan. It distributes production drift so adjacent panels are from adjacent batches, and lets an outlier be placed on a secondary elevation or rejected. Unnumbered panels installed as they arrive read as a random patchwork.

How should colour be assessed on site?

Vertically, outdoors, in diffuse daylight rather than direct sun, with panels in their installed relationship, at an agreed viewing distance, usually five to ten metres. Assessing a facade panel at arm’s length under factory lighting sets a standard no cementitious product meets.

How do I match panels for a later stage or a repair?

Reserve cement, sand, pigment and control samples for the later stage at the start of the first, and record the mix and sources. Matching from fresh materials years later is the hardest colour problem in the industry, and the usual solution is a deliberate tone change at a joint.