A panel fixing system is the set of anchors and connections that attach a cladding panel to its supporting rail or bracket. It is a different design problem from the substructure, which is the secondary framing behind the panel. The substructure decides how load gets back to the building; the fixing system decides how load gets out of the panel, and it is governed by what the panel material can take at a point rather than by what the rail can span.
Every panel has two kinds of fixing. Two gravity points carry the weight. The remaining points carry wind pressure and suction only, and are free to slide in plane so the panel can grow, shrink and move without prying on its anchors.
At a glance
| Property | Typical value | Note |
|---|---|---|
| Gravity fixings per panel | Two, normally | Statically determinate; a third gravity point is an unpredictable load path |
| Restraint fixings | Remainder of the fixing points | Carry wind only, slotted or sleeved to allow in-plane movement |
| Cast-in socket | M10 to M16 threaded ferrule in a rib, boss or bonding pad | Standard for GRC and precast; capacity set by embedment and skin thickness |
| Undercut anchor | Drilled into the rear face without penetrating the front | Needs controlled undercut, depth and torque, and a minimum panel thickness |
| Flex anchor | Bent rod bonded to the GRC skin and welded to a stud frame | Flexes so the thin skin can move relative to the steel frame |
| Hook-on rail | Panel-mounted hook engaging a horizontal rail | Fast, concealed and demountable for replacement |
| Face fixing | Visible rivet or screw through an oversized sleeved hole | Cheapest and most tolerant; the fixing head is part of the appearance |
| Anchor material | Grade 304 or 316 stainless steel | 316 in coastal exposure and in contact with cement |
| Site proof testing | Sample anchors tested to an agreed multiple of design load | Rate and load set in the specification and the inspection plan |
Gravity and restraint: the distinction that governs everything
A fixing that carries weight and a fixing that resists suction are not the same component and must not be detailed as though they are. A gravity fixing takes the panel dead load in bearing or shear and transfers it into the rail. It is stiff, it sits close to the panel centre of gravity, and there are normally exactly two per panel so the load path is determinate and calculable.
A restraint fixing takes wind pressure and suction out of the plane of the panel and nothing else. It has to be free to move in the plane of the panel, through a slotted hole, a sleeved oversized hole or a sliding profile, so the panel slides past the restraint as it expands rather than levering on it. A restraint point built as a rigid bolted connection becomes a third or fourth gravity point, load redistributes unpredictably, and the panel cracks at the anchor rather than anywhere a calculation predicted.
For a lightweight panel the restraint fixings usually govern. A GRC panel at 40 kg per square metre weighs a fraction of the suction acting on it, so anchor sizing, edge distances and fixing counts are driven by wind, and by the local pressure factors that make corner and parapet panels worse than field panels.
Anchor types and what they suit
Cast-in sockets are the standard fixing for GRC and precast. A stainless threaded ferrule is cast into a rib, a thickened boss or a bonding pad, and the connection is made with a bolt from the rail. Capacity depends on embedment depth, on the surrounding material and on the cone that would fail in pull-out, so edge distance and rib geometry matter as much as ferrule size. Socket positions are set when the mould is designed, not later.
Undercut anchors are drilled into the rear face of a dense panel to a controlled depth, with a widened base so the anchor keys into an undercut rather than relying on friction. They do not penetrate the front face, which is why they are standard for thin stone and dense composites. They need a minimum panel thickness, a calibrated rig and depth and torque control. An anchor set too deep, too shallow or into a void has no reliable capacity and cannot be identified once the panel is hung.
Flex anchors belong to stud frame GRC. A bent stainless rod has one leg embedded in a bonding pad on the back of the thin skin and the other fixed to the steel stud frame. The bend is deliberately flexible so the skin, which moves with moisture as well as temperature, can move relative to a frame that does not. Gravity anchors in the same panel are stiff and grouped centrally, so the skin hangs from one small stiff zone and is restrained everywhere else by flexible ones.
Hook-on rails carry a hook or cleat on the back of the panel that drops onto a continuous rail. They are quick, concealed, tolerant of small setting-out errors and demountable, so a single panel can be lifted out for replacement. Face fixings are visible rivets or screws through the panel into the rail: cheapest and most tolerant, but the hole must be oversized and sleeved so the panel can move, and the fixing head is a design element whether or not anyone intended it. Bonded systems using structural silicone or tape are used, but most jurisdictions also require mechanical retention plus a project-specific adhesion and compatibility assessment.
Adjustability in three axes
Every fixing system has to reconcile a factory-made panel with a site-built structure, using adjustment split across three connections. In and out adjustment, controlling the facade plane, is taken mostly at the bracket to structure connection. Vertical and horizontal adjustment, controlling level and joint width, is taken at the bracket to rail and rail to panel connections. A final few millimetres sits at the panel itself.
The principle is coarse to fine in that order. Typical ranges are ±10 to ±25 mm at the structure, ±10 to ±15 mm at the rail and ±3 to ±5 mm at the panel. Trying to take up a 30 mm structural deviation at the panel connection is how a facade ends up with anchors at the end of their slots, panels binding on their neighbours and joints that vary visibly across an elevation.
Adjustment also has to be locked. Serrated washers, toothed plates, keyed profiles or a designed friction connection at a specified torque all work. A plain washer in a slot, tightened by feel, can creep under cyclic wind load.
Designing and proving the fixings
Fixing layouts are engineering, not detailing preference. The panel engineer sets the number, type and position of every anchor from the panel geometry, the material properties, the zoned wind pressure for that part of the elevation and the movement the panel will undergo. Those positions are then reflected in the mould, the rib layout and the shop drawings, which is why fixing design has to precede mould manufacture rather than follow it.
Anchor design in brittle thin-section materials carries higher factors than steel-to-steel connections, because the failure mode is a cone of material pulling out rather than a ductile yield. Published capacities belong to a stated material, thickness, embedment and edge distance and do not transfer to another panel without assessment.
Verification happens in three places: the factory, where anchors are installed under production control and sample tested; the mock-up, where the complete system is loaded and, where required, tested within an AS 4284 sequence; and site, where a nominated sample of structural anchors is proof tested to an agreed multiple of design load.
- Specify anchor material and grade, not just a type
- Require fixing design certified by the panel engineer against the project wind pressures
- Require anchor positions on shop drawings before mould manufacture
- Nominate a site proof test rate, load and acceptance criteria
- Decide at design stage whether individual panels must be removable for replacement
Standards and references
- AS/NZS 1170.2 Wind actions; AS/NZS 1170.0 General principles and load combinations
- AS 5216 Design of post-installed and cast-in fastenings in concrete; AS 3600 Concrete structures
- AS/NZS 4673 Cold-formed stainless steel structures
- GRCA Specification for the Manufacture, Curing and Testing of GRC Products (anchor and bonding pad requirements)
- PCI MNL-128 Recommended Practice for Glass Fiber Reinforced Concrete Panels (anchor design)
- AS 4284 Testing of building facades, including proof loading of the complete system
- European Assessment Documents for kits for external wall claddings, including undercut anchor assessment
- ASTM C1354 Standard Test Method for Strength of Individual Stone Anchorages in Dimension Stone (US)
Where this matters on a ShapeShift project
Spanda, Elizabeth Quay: A large sculptural work, and a demonstration of the principle behind every anchor layout: fixing positions are set in the mould as part of the element, rather than drilled and resolved once the element exists.
Related terms
Questions specifiers ask
What is the difference between a gravity fixing and a restraint fixing?
A gravity fixing carries the panel dead load and is stiff and fixed. A restraint fixing resists only wind pressure and suction out of the plane of the panel, and is slotted or sleeved so the panel can move in plane without loading the anchor.
How many fixings does a facade panel need?
Normally two gravity points plus as many restraint points as the wind pressure requires. The panel engineer sets the number from panel size, material, zoned design pressure and movement; corner and parapet panels usually need more than field panels.
What is an undercut anchor?
An anchor drilled into the rear face of a panel to a controlled depth with a widened base, so it keys into an undercut rather than relying on friction. It does not penetrate the front face, which is why it is standard for thin stone and dense composite panels.
Why do stud frame GRC panels use flex anchors?
Because a thin GRC skin moves with moisture and temperature and a steel stud frame does not. The flexible leg lets the skin move relative to the frame, while stiff gravity anchors are grouped centrally so the skin hangs from one small zone.
Can individual panels be replaced?
With a hook-on rail or a demountable fixing, yes. With face fixings or bonded systems, neighbouring panels usually have to come off first. Decide it at design stage, because it is a maintenance and remediation cost for the life of the building.
Do facade anchors need site testing?
Structural anchors into the building are normally proof tested on a sample basis. The rate, the test load as a multiple of design load and the acceptance criteria belong in the specification and the inspection and test plan.
Need a fixing layout designed with the panel rather than after it? ShapeShell panels are supplied with an engineered anchor system set out on the shop drawings before mould manufacture. Talk to the engineering team
Reviewed by Richard Halvorsen, General Manager, ShapeShift Technologies. Last updated September 2026.