Brighton Grammar’s St Andrews

Brighton, VIC

Project Details

Location: 90 Outer Cres, Brighton VIC 3186

Scope: Cladding

Completion Year: 2025

Architect: Architectus

Builder: Vaughan Constructions

ShapeShift Product: ShapeShell™-RC

The Centre for Science, Creativity and Entrepreneurship

Brighton Grammar School’s project is a collaboration between Brighton Grammar School, St Andrew’s Parish, and the Diocese of Melbourne. The building embodies the school’s commitment to shaping the future success of its students while strengthening its connection with St Andrew’s.

Located on the secondary school campus, this 11,930 m² multi-level precinct offers innovative and dynamic learning spaces designed to inspire creativity and foster academic excellence.

Project Overview

Brighton Grammar’s St Andrews Exchange project provides the school with a unique opportunity to re-imagine teaching and learning in creative arts, science, design, and technology as well as creating innovative facilities to encourage emerging education.

The facility offers specialised spaces tailored for hands-on learning and creative exploration. These include multi-purpose rooms for robotics and prototype testing, a fully-equipped studio for visual arts, printmaking, and digital media, as well as dedicated laboratories for psychology, chemistry, biology, and physics. Breakout areas and display spaces encourage collaboration, while staff offices, storage rooms, and lab technician facilities ensure seamless functionality.

Technical Challenges

The cladding area is 1,596 m² across 727 panels (shrouds, pavilion and plant room) and 651 m² of soffits, walls, walkway and canopy. The model must be dimensionally accurate and issued for construction as clean, watertight NURBS surfaces that include interfacing elements such as the primary structure.
 
Panels must not exceed 3 m × 2 m to avoid a steel subframe, must fit within a 40 ft high-cube container envelope, and are joined with 10 mm open butt joints. They typically weigh 40-60 kg/m², are non-load-bearing rainscreen elements only, and are designed for a C3 corrosivity environment.

Our Role to The Project

The panels are made from ShapeShell-RC, a reinforced concrete product

  • Scope: external shroud cladding, pavilion and plant room panels, in dark grey or a lighter option, soffits, walls, canopy and the walkway to the church, in white or light grey.
  • Size: about 1,596 m² of visible surface across roughly 727 panels.
  • Included: panel fabrication and tooling, a finish sample for sign-off, engineering guidance, a Reg 126 design certification, and delivery to the warehouse.

Project Outcome

The project successfully delivered a multi-purpose innovation hub that includes:

  • Advanced Learning Spaces: A two-level facility housing dedicated learning environments for science, technology, and the arts, designed to foster interdisciplinary learning and real-world problem-solving.

  • Campus & Community Additions: Two basement-level carparks and three new tennis courts to enhance site dynamism, alongside a link bridge connecting the centre to the existing library (named in honor of late associate principal Paulo Sampaio).

  • Heritage Tribute: A space that honors school alum John Robertson Duigan, highlighted by a suspended replica of ‘The Duigan Flyer’ aircraft located in the 1882 Gallery.

Innovative materials for educational spaces

Through innovative design and meticulous material integration, it sets a new benchmark for multi-use educational spaces.

Contact Us

Discuss Your Needs