11 Eastern Road
Melbourne, VIC
Melbourne, VIC
Architect: Rothelowman
Contractor: Hacer
Engineer: Webber Design
Product: ShapeShell™-RT
Surface Area: 465 sqm
Application: Featured Lobby
Responsibility: Design, Engineer & Manufacture of Feature Elements
ShapeShift Technologies was engaged to deliver the feature lobby elements using its advanced ShapeShell™-RT system. Our role encompassed the complete design, engineering, manufacture, and supply of the prefabricated panels, ensuring both the architectural vision and practical buildability were achieved. Working from the architect’s 3D model, we developed detailed shop drawings and engineered the system to Australian standards, providing certification and quality assurance throughout. Using our large-format 5-axis CNC machines, each panel was tooled and fabricated with high dimensional accuracy, then coated in a bespoke cementitious Berkshire White finish.
To guarantee performance, every component was produced under ISO 9001 quality systems and verified with 3D scanning for precise fit on-site. The panels were supplied as lightweight, modular units, carefully packed into 40ft high cube containers for ease of transport and efficient handling on arrival. Importantly, our scope was supply only, with installation, bracketry, and site-based works managed by others. This approach enabled ShapeShift Technologies to focus on delivering a high-quality, durable, and visually striking lobby feature, while providing the builder with a streamlined prefabricated solution that reduced time, cost, and risk on-site
11 Eastern Road in Melbourne has a 465 sqm feature lobby delivered in ShapeShell™-RT for architect Rothelowman. We worked from the architect’s 3D model, produced the shop drawings, engineered and certified the system to Australian standards, tooled and fabricated the panels on large-format 5-axis CNC equipment, coated them in a bespoke cementitious Berkshire White finish, and verified every component by 3D scanning before delivery.
Prefabricated lobby panels have one failure mode that matters: they arrive on site and do not fit. By that point the panels are made, the programme has no slack, the lobby is on the handover critical path, and the only options are all bad. Trim them, and you lose the factory edge and the finish. Send them back, and you lose weeks. Pack out behind them, and the joint lines stop being straight.
The usual defence is a site trial fit, which finds problems late and costs a delivery. The better defence is verifying the part against the model before it leaves the factory. Scanning each component in three dimensions and comparing it to the digital model catches a deviation where it is cheap to fix, which is the whole reason to do it.
The chain here runs in one unbroken line. The architect’s 3D model becomes the shop drawings. The shop drawings drive the 5-axis tooling, so the mould is machined to the model rather than interpreted from a drawing by hand. The finished panel is then scanned and checked back against the same model it came from.
Every step references the original geometry, so error cannot accumulate between trades the way it does when a model is redrawn, then detailed, then built to the detail. On a lobby where the visible tolerance is a couple of millimetres, that is the difference between a system that fits and one that nearly fits.
The system was engineered to Australian standards with certification and quality assurance provided as part of the package, and every component was produced under ISO 9001 quality systems.
That matters on an internal feature more than people expect. Lobby elements are large; they are fixed overhead and at height in places, and they are in the most heavily used space in the building. An engineered and certified system means the fixings and the panels have been designed for their loads rather than assumed adequate because the panels are light.
The panels carry a bespoke cementitious finish in Berkshire White, so the lobby reads as a pale stone or concrete surface. Worth being clear about what that is: the finish is cementitious, the substrate underneath it is ShapeShell™-RT, which is a polymer composite and not a non-combustible material. For an internal lining, that is a different question from a facade, but the distinction should never be blurred when a panel is specified.
This project used ShapeShell-RT, our FRP composite system.
Browse all ShapeShift Technologies projects, or compare the panel materials in cladding panels compared.