Parramatta Public School
Parramatta, NSW
Parramatta, NSW
Architect: Grimshaw
Builder: Watpac
Product: ShapeShell™-RC
Surface Area: Facade Panels
Application: Standard Panels
Responsibility: Design, Engineer & Manufacture of Feature Elements
Parramatta Public School was rebuilt as part of the combined Arthur Phillip High School and Parramatta Public School redevelopment on Macquarie Street, Parramatta, delivered for the NSW Department of Education. Grimshaw designed the campus, won through an international design competition, and Watpac, now BESIX Watpac, was the builder. ShapeShift designed, engineered and manufactured the ShapeShell-RC facade panels for the primary school.
| Location | Macquarie Street, Parramatta, NSW |
|---|---|
| Opened to students | Term 1, 2020, with the final stage of the combined project completed later that year |
| Architect | Grimshaw |
| Builder | Watpac, now BESIX Watpac |
| Client | NSW Department of Education |
| Scale | Primary school, four storeys, 7,850 m², capacity 1,000 students, 40 flexible learning spaces |
| ShapeShift product | ShapeShell-RC glass reinforced concrete |
| Application | Standard facade panels |
| Scope | Design, engineering and manufacture of feature elements |
The primary school is a curvilinear building wrapping an outdoor learning area and playground, on a dense inner-Parramatta site shared with a seventeen storey high school. Three things follow from that. The facade is curved, so a flat panel system either fails the geometry or forces the architecture into facets. The building is a school, so the external skin has to be non combustible, impact tolerant at ground level and low maintenance for decades of public ownership. And the site was live, with two schools being delivered next to each other, so panels had to arrive to programme and install quickly in constrained access.
Glass reinforced concrete suits a curved school facade better than either precast or sheet cladding. The panels are moulded, so curvature is a mould question rather than a faceting compromise, and at 15 to 25 mm they are light enough to install without heavy lifting plant on a tight site. ShapeShell-RC is classified non combustible when tested to AS 1530.1, which keeps the facade on a straightforward compliance path for a Department of Education asset. With no steel reinforcement there is no corrosion mechanism and no cover spalling to budget for over the life of the building, and through-pigmented colour means chips and drilled penetrations expose the same colour rather than a grey substrate.
Parramatta Public School opened to students in Term 1 of 2020 as part of the first high-rise public school campus in New South Wales, a project Grimshaw positions as a prototype for future-focused learning. The primary school’s fibre reinforced concrete facade carries the curved form the design intended.
Related: ShapeShell-RC, standard GRC facade panels, material fire rating, all projects.
This project used ShapeShell-RC, our GRC panel system.
Browse all ShapeShift projects, or compare the panel materials in cladding panels compared.